2006171-01

SolTerra Engineering, inc.

Projects

Your Project, Our Experience

SolTerra Engineering offers a full spectrum of testing and inspection services. Because this is our only professional service, it is our expertise. There is no project too large or too complex for our team to handle, and we offer an unparalleled combination of education and experience allowing us to deliver superior services to you— our client.

Project Archive

Some of our recent and favorite projects from the past.

Project Photo Gallery

Great photos of sites, projects, and the people involved.

Project Archive

UW Arena Auditorium Phase II

This project was an addition to the existing University of Wyoming Arena Auditorium.

UW ERR Building

This is one of the newest buildings at the University of Wyoming Campus and scheduled to be completed in 2019.

Harney St Bridge

The Harney St. Bridge was completed in 2018 and serves as the new connection between east downtown and west Laramie.

Laramie, wy

UW Arena P:II

UNIVERSITY OF WYOMING ARENA AUDITORIUM – PHASE II

This project was an addition to the existing University arena that included foundation observation, reinforced concrete inspection, structural masonry inspection, floor flatness, micro piles, drilled light piers, and construction materials testing.

Laramie, wy

UW EERB

UNIVERSITY OF WYOMING ENGINEERING EDUCATION & RESEARCH BUILDING

This is one of the newest buildings at the University of Wyoming. It is a 5-story steel framed, Campus building set to be completed in 2019. SolTerra has overseen the testing and inspection for foundation observation during drilled pier installation, reinforced concrete inspection, structural masonry inspection, shotcrete inspection, floor flatness, and construction materials testing. SolTerra also worked with a geotechnical engineer to stabilize the building footprint with geo-fabric during the site clearing of old residential homes and apartments.

Laramie, wy

Harney St Bridge

HARNEY ST BRIDGE – LARAMIE,WY

The Harney St. Bridge was completed in 2018 and serves as the new connection between east downtown and west Laramie. SolTerra provided concrete testing, compressive strength results, and temperature monitoring during the bridge deck placement.

Project Photo Gallery